Policy

Publication and impartiality

Clients pay us to test their products. That is the structural conflict at the centre of every vendor-paid laboratory, and the only useful answer to it is a mechanism a client cannot override. Here is ours.

Last updated August 2026

The short version. Once a certificate is released it cannot be deleted, edited or unpublished, by the client or by us. A failing result stays verifiable forever. A correction issues as a new version, and both versions remain on record and remain publicly verifiable. This is enforced by database constraints, not by our good intentions.

1. What a client controls and what it does not

A client controls:

  • Whether to submit a sample at all.
  • Which tests to order.
  • Whether their certificates are listed on a public vendor page.
  • Whether to hand the accession number and access code to anyone.

A client does not control:

  • Whether a released certificate remains verifiable. It always does.
  • What a released certificate says. It cannot be altered after release.
  • Whether a failing result is issued. If the data fails, the certificate says failed.
  • Whether a superseded version disappears. It does not; both versions stay on record.

Public listing publishes more than a directory. It also serves the analyte result summaries for released certificates through our storefront API, so a client who has opted in can render their own results on their product pages. Failing results are included and cannot be filtered out. What it never publishes is the access code, the certificate PDF or its fingerprint: a reader still needs the code printed on the vial to open the document itself.

The distinction between listing and verification matters. Turning off a public vendor page removes a directory entry. It does not and cannot remove the certificate. Anyone holding a vial with an accession number and access code can still verify it, and will still see the same result, whatever the vendor has since decided about their marketing.

2. How the rule is enforced

Policies get bent under commercial pressure. Constraints do not. These are the specific mechanisms, all of which live in the database rather than in the application:

ControlWhat it prevents
Immutability trigger on certificatesA released certificate cannot be updated. Attempting it raises a database exception, including from an administrator account.
Delete prohibition on certificatesNo certificate row can be deleted at all, at any status, by anyone.
Versioned supersessionA correction creates version 2 and marks version 1 superseded. It does not overwrite version 1, which stays verifiable and stays visible.
Append-only custody logCustody events cannot be updated or deleted, so the timeline of what happened to a sample cannot be rewritten after the fact.
Second-person releaseThe person who entered a result can never be the person who releases it. Enforced on the release path itself, not by procedure.
Content fingerprintEach released certificate is fingerprinted with SHA-256 at render. A document that does not match its fingerprint fails verification.

You do not have to take this on description. Pull any certificate you hold and check it on the verification page, which is served by the laboratory rather than by the vendor whose product it describes.

3. The certificate is our document, not co-marketing

A certificate carries the Laboratory's identity and no one else's. We do not place a client's logo, brand mark, watermark or styling anywhere on a certificate, a verification page or a report, and we will decline a request to do so.

This is not a design preference. A test report is the Laboratory's statement about a sample, and a report that carries the brand of the party being tested reads as a joint publication rather than an independent finding. It is a poor look under clause 7.8 and a worse one under the impartiality requirement in clause 4.1. Competitors in this market do watermark their clients' logos onto their own certificates; we will not.

The client is named on the certificate, in plain type, as the party who submitted the sample. That is the whole of their presence on it.

4. No payment changes a result

Specifically, and without exception:

  • We do not offer, and will not accept payment for, withdrawal of a released certificate.
  • We do not price testing on outcome. The fee is the same whether the result passes or fails.
  • We do not offer a preview of results conditional on the client deciding whether to proceed to release. Release follows review; it is not a purchasing decision.
  • No member of laboratory staff holds an equity, commission or royalty interest in a client's product sales.

5. Corrections and disputes

Laboratories make mistakes. A policy that pretends otherwise is not credible. What matters is whether the correction is visible.

  1. A client disputes a result in writing through the portal. The sample enters a disputed state, which is recorded in the custody log with a timestamp.
  2. We re-examine the data, and where warranted re-test from the retained aliquot described in the retention policy.
  3. If the original result stands, it stands, and the dispute remains in the record.
  4. If the original result was wrong, a corrected certificate issues as a new version. The original stays on record, marked superseded, and stays verifiable.

At no point does a dispute cause a certificate to vanish. The worst outcome for us is a visible correction, which is the correct incentive.

6. Confidentiality

Everything not published is confidential. We do not disclose client identities, submission volumes, unreleased results or dispute correspondence to anyone, including other clients, except where disclosure is required by law or by an accreditation body conducting an assessment. Where the law compels disclosure we will tell the client unless we are prohibited from doing so.

A released certificate is not confidential as against the holder of its accession number and access code. That is the entire point of it.

7. Impartiality of personnel

Consistent with ISO/IEC 17025 clause 4.1, laboratory personnel are free from commercial, financial and internal pressures that would compromise impartiality. Risks to impartiality are reviewed on an ongoing basis, and identified risks are recorded and mitigated. The Technical Director's release authority is not subject to override by commercial staff, and the release control described above makes that structural rather than procedural.